ZIP 12 / 12 · Final Polish · Deploy · Rollback · Documentation · Handoff
Final Release Kapanış Merkezi
12 ZIP teslim zinciri, deploy paketi, rollback planı, handoff ledger ve GO/NO-GO kilidi tek yüzeyde. Bu ekran final teslim paketidir; canlı GO harici VDS, domain, SSL, gerçek browser/mobil kanıt, rollback drill ve operatör final receipt olmadan açılmaz.
Final kilit
ZIP12_FINAL_RELEASE_CLOSEOUT_LOCKED
Operator final receipt required: Evet
12 ZIP teslim zinciri
Audit başlangıcından final handoff kapanışına kadar traceability| ZIP | Paket | Artifact | Durum | GO etkisi |
|---|---|---|---|---|
| 1/12 | Ürün denetimi ve roadmap | audit-roadmap | completed | no-go baseline identified |
| 2/12 | Stabilite ve core WMS fix | stability-core-wms | completed | technical blockers reduced |
| 3/12 | Global tasarım sistemi ve navigasyon | design-system-nav | completed | UX shell standardized |
| 4/12 | Public, auth, signup, demo, onboarding | public-auth-onboarding | missing-evidence | first value flow packaged |
| 5/12 | Core WMS operasyonları | wms-products-stock-transfer | missing-evidence | daily warehouse work surface packaged |
| 6/12 | Satın alma, tedarikçi ve finans | procurement-finance | missing-evidence | operational chain packaged |
| 7/12 | Mobil PWA, barkod ve saha | mobile-pwa-field | missing-evidence | field execution packaged |
| 8/12 | Dashboard, raporlar ve BI | dashboard-bi-reporting | missing-evidence | decision layer packaged |
| 9/12 | Form, tablo ve iş akışı sürtünmesi | forms-tables-workflow | missing-evidence | daily usability friction reduced |
| 10/12 | Performans, erişilebilirlik, güvenlik ve responsive QA | quality-security-responsive | missing-evidence | quality gate packaged |
| 11/12 | E2E regression ve release confidence | e2e-release-confidence | missing-evidence | regression chain packaged |
| 12/12 | Final polish, deploy, rollback ve teslim kapanışı | final-release-closeout | zip12-added | handoff package completed; live GO still locked |
Deploy paketi
Operatör tarafından tamamlanacak bloklayıcı adımlar1 · Paket hash doğrulamasha256sum -c DepoSistemleri_ZIP12_FINAL_RELEASE_CLOSEOUT_2026-06-16.zip.sha256
Operator
Blocking=True
2 · İzolasyonlu staging extractunzip -q DepoSistemleri_ZIP12_FINAL_RELEASE_CLOSEOUT_2026-06-16.zip -d /opt/deposistemleri/releases/zip12
DevOps
Blocking=True
3 · Environment guard kontrolüpython scripts/final_quality_gate.py && python scripts/zip12_final_release_closeout_acceptance_check.py
QA/Release
Blocking=True
4 · DB backup ve migration dry-runscripts/zip47_backup_restore_dry_run_check.py
DB/DevOps
Blocking=True
5 · Container build ve smokedocker compose -f docker-compose.production.yml build && docker compose -f docker-compose.production.yml up -d
DevOps
Blocking=True
6 · Harici browser ve mobil kanıtcollect /healthz, /readyz, /final-release, /wms, /mobile-field screenshots/video
QA/Operator
Blocking=True
7 · Operatör final receiptOPERATOR_ZIP12_FINAL_RELEASE_RECEIPT_TEMPLATE.md doldur ve imzala
Operator
Blocking=True
Rollback planı
Trigger, RTO/RPO ve doğrulamaT-0 snapshotCurrent release symlink, DB backup, env snapshot ve nginx conf kopyası al
15-30 dakika
RPO: 0-15 dakika · Trigger: Deploy öncesi zorunlu
Health degradation/healthz veya /readyz iki ardışık kontrolde başarısızsa yeni release pasifleştir
30 dakika
RPO: son başarılı backup · Trigger: 5xx, startup fail, DB migration fail
UX-critical rollbackWMS, mobil saha veya login kritik ekranında 500/boş ekran varsa önceki release symlink'e dön
30-45 dakika
RPO: son başarılı backup · Trigger: core workflow blocker
Security rollbackSecret exposure, tenant isolation breach veya unauthorized access kanıtında tüm public traffic kapat
immediate containment
RPO: incident window · Trigger: security incident
Post rollback validationhealthz, readyz, login, WMS, procurement, mobile, analytics ve final-release smoke tekrarla
30 dakika
RPO: n/a · Trigger: rollback sonrası zorunlu
Handoff ledger
Ürün, engineering, QA, DevOps, security ve CS teslimleriGO/NO-GO kararı
FINAL_PACKAGE_PASS_BUT_LIVE_GO_LOCKEDZIP12 final teslim paketidir; canlı GO için sandbox dışı kanıt ve imzalı operatör onayı gerekir.
- production_go_allowed=False
- live_go_allowed=False
- commercial_launch_go_allowed=False
- external_browser_evidence_required_for_go=True
- operator_final_release_receipt_required_for_go=True